b'CHANGEMENTS CLIMATIQUESclimatic loads, the LSMRS performanceProtective Roofing level is determined either as Bronze, Silver or Gold.CSAA123.26proposesthefollowingSafety Productsfor Wind Performance Requirements for LSMRS:Performancerequirementsofthe BYLSMRSidentifiedasBronzeareas pertheexistingprovisionsspecified intheNationalBuildingCodeof Canada and/or National Energy Code for Buildings for the normal climate condition. For Silver and Gold levels:oTheLSMRSshallbeevaluatedinaccordancewithCAN/CSA-A123.21onatestspecimenthat shall include at least two penetration details (curb and stack pipe) and a parapet. oParapetattachmentsshouldbedesignedtoaccommodatebaseThe PR 100 Guardrail System is an efcient and flashingloads.Theattachmentpractical perimeter guardrail that allows you to workspacinginparapetcornerregionsright to the edge of the roof.should be differentiated from that Meets and exceeds OSHA & WCB requirementsof other regions. Accommodates: parapets and cant stripsoInlieuofconcealedcleat Provides unobstructed access to roof edgeEasy to installattachment,exposedfasteners shouldbeusedtoattachvertical flanges of coping and edge flashings. Number12stainlesssteelscrews withstainlesssteelwashersare recommended to be used in wood anddiameterstainlesssteel spikes in concrete. Fastener spacing has to be determined based on the design wind loads and applicable toThe PR 600 Mobile Fall Protection Systemthe corner and edge zones. ANSI/ can be moved along the roof by pulling the cart to the desired SPRIES-1providesguidanceonworking location, providing a safe working area. The PR 600fastener spacing and thickness of themeets O.S.H.A. compliance 1926.502D.coping and edge flashing. oBase flashings shall be installed toRoofing & Sheet Metal Super Service Centres have a minimum height of 304 mm (12) where parapets are installed asEDMONTON, AB CALGARY, AB WINNIPEG, MBa continuation of the exterior wall.(780) 432-2786 (403) 255-8236 (204) 338-7613oWindupliftperformanceoftheBARRIE, ON HAMILTON, ON TORONTO, ON installedLSMRSshallbeverified(705) 792-6683 (905) 560-2858 (416) 534-8421accordingtoNRCGuidelinesOAKVILLE, ON PICKERING, ON LONDON, ONforCommissioningandCertifying(905) 825-0034 (905) 426-4443 (519) 668-3626theResiliencyofRoofsSubjectedto ExtremeWeatherEvents(underWESTON, ON WESTON, ONdevelopment).Thecausefor(Weston Road) (Signet Drive)roofsystemblow-offisoften(416) 745-4111 (416) 744-2050workmanshipdeficiencies,www.sparmarathon.cawhichcanbedifficulttodetect AUTOMNE/HIVER 2019 COUVERTURES CANADA 37'