38 BUILD MANITOBA winnipegconstruction.ca considered,” Dieleman says, joking, “And then, there’s the added challenge of just keeping tropical plants alive in Winnipeg, which is uncommon in and of itself.” Making The Leaf a reality has been no small undertaking. The key factor has been on-site coordination and a spirit of collaboration from the start. Assiniboine Park Conservancy chose a CCDC 5B Construction Management (CM) delivery model, which Peters believes set the foundation for a faster and more cohesive build: “This was a great option for a project as unique as Canada’s Diversity Gardens, as it got us to the table early in the design process, allowing us to be part of the solution and assist the owner and the design team in providing constructability reviews, budgeting and also engage subcontractors for design workshops all during the pre-construction phase.” With more than a year left in the project, Dieleman says APC is looking forward to introducing Winnipeg’s residents and visitors alike to a one-of-a-kind attraction while breathing new life into Assiniboine Park. “The amount of things we can do in this facility, and the amount of experiences we can create for the public, are exponential,” adds Dieleman. THE LEADER IN ARCHITECTURAL ALUMINUM PRODUCTS Catalogue Pages www.alumicor.com Specifications CAD details CURTAIN WALL WINDOWS & VENTS STOREFRONT ENTRANCE ENTRANCE DOORS INTEGRAL WINDOWS