33 Issue 4 Winter Edition 2018 BUILD MANITOBA Dom Costantini, Vice President & District Manager, Bird Construction Marten Duhoux, Principal, FT3 Scott Hammond, Partner, SMS Engineering Ltd. Cindy Rodych, Principal, Rodych Integrated Design Inc. Moderator: Colleen Kuruluk, Manager of Marketing Programs, Manitoba Hydro PANELLISTS trend ENERGY SHARING S.H.E.D. CENTREPOINT BUILDING “When I was with Stantec, we developed the first geothermal district/campus at SHED – the Centrepoint Building. We took the three buildings – the hotel, the office building and the parkade – and we built a larger field for the three of them and connected all the systems, and it worked beautifully…What we had there was the perfect group of buildings because the load in the office building was highest during the day, whereas the load in the hotel was highest during the night. So, they offset each other really well and then the parkade was used to shed heat…The return on investment was less than three years, so it was pretty incredible when you think of geothermal. ”– Cindy Rodych “The fairly high installations costs can be offset when you’re looking at multiple buildings sharing one of these systems. You can also interconnect their energy- generating capabilities – you can have covered walkways, solar photovoltaic panels over them, you can prescribe that their roofs need to have solar photovoltaics or wind turbines for a little bit more green energy. That’s probably the main part of the green world – we’re driving towards low carbon. ”– Scott Hammond ADDED RENEWABLES Wind Turbines Photovoltaics project: