b'3,512,000 ounces of platinum, 1.67 g/tRim South Extension project (located inN I M L TA E M R E H OT E Spalladium, containing 4,309,000 ozproximity to Glencores Nickel Rim South palladium, and 0.37 g/t gold, containingmine infrastructure).1,399,606 oz of gold (Measured and IndicatedDecember 2023)8,600,000 tonnes at 1.90-per-centCOLEMAN MINEnickel, containing 163,400 tonnes ofMine Manager Gary Annettnickel, 2.30-per-cent copper, containingProduction Rate863,000 tonnes per year (2023)197,800 tonnes of copper, 0.04-per- Opened1970 (initial) cent cobalt, containing 3,440 tonnesLife of Mine2025of cobalt, 1.20 g/t platinum, containing 331,796 ounces of platinum, 1.30 g/t palladium, containing 359,000 ounces ofCOPPER CLIFF COMPLEXpalladium, and 0.40 g/t gold, containingMine Manager Stephanie Bleker110,599 ounces of gold (Inferred Production Rate985,000 tonnes per year (2023)December2023) Opened 1886Life of Mine2043 Life of Mine2043EmploymentNearly 4,000 (Vale Sudbury Operations total workforce) NotesVale Ontario Operations include sixCREIGHTON MINEactive mines, the Clarabelle mill, theMine Manager Derek KulyskiCopper Cliff smelter and Copper CliffProduction Rate406,000 tonnes per year (2023)nickel refinery as well as a cobalt andOpened 1901precious metals refinery in Port Colborne.Life of Mine2043The Copper Cliff Complex South Mine project was opened in October 2022, connecting more than 12 km of tunnelsGARSON MINEbetween the south and north shafts ofMine Manager John RyanCopper Cliff Mine. The Copper Cliff MineProduction Rate650,000 tonnes per year (2023)Complex is anticipated to have 20 yearsOpened 1907 - 1986; 1993 (reopened)of mine life. Copper CliffPhases 3 & 4Life of Mine2025 - 2026are under study, as is CreightonPhase 5. Both the Copper Cliff and Stobie pitsTOTTEN MINEare in the pre-feasibility study stage. All projects in a study phase require ValeMine Manager Alan VermeerschBoard of Directors approval to proceed.Production Rate518,000 tonnes per year (2023)Collaborative discussions with GlencoreOpened 2014Canada are underway for the NickelLife of Mine2042EST. 1986SASKATOON306-933-3010WINNIPEG204-235-4013PRINCEALBERTDRIVER TRAININGSCHOOL306-922-2221From ice roads in Manitoba to remote mines in Ontario nrtinquiry@nrtlp.comNRT GOES WHERE NO ONE ELSE DARES TO GO www.nrtlp.com ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2025 21'