b'GOLD MINES RAINY RIVER MINE ending June 30, 2022) New Gold Inc. 2023120,840 ounces of gold (fiscalgold producer underground, open pit year ending June 30, 2023) 2024112,700 ounces of gold (fiscal Mailing Address5967 Highway 11-71, P.O. Box 5 year ending June 30, 2024)Emo, ONP0W 1E0 2025135,000 ounces of gold Tel: (855) 482-0900 (fiscal year ending June 30, 2024, Websitewww.newgold.com management projection)Mine ManagerGord Simms, General Manager Resources32,400,000 tonnes at 6.89 g/t gold, Production Rate21,000 tonnes per day (mill capacity) containing 7,174,000 ounces of gold Production2021234,469 ounces of gold and(Measured and Indicated for Red Lake 611,433 ounces of silver Gold Mines Operations combined2022229,822 ounces of gold andDecember 2023)402,964 ounces of silver 22,700,000 tonnes at 6.10 g/t gold, 2023253,745 ounces of gold andcontaining 4,456,000 ounces of gold 472,018 ounces of silver(Inferred for Red Lake Gold Mines 2024225,694 ounces of gold Operations combinedDecember 2023)2025315,000 ounces of goldOpened 1949(management projection) Life of Mine2040Resources71,613,000 tonnes graded at 1.42 g/t goldEmploymentApproximately 900 employees and and 3.72 g/t silver, containing 3,258,000contractors ounces of gold and 8,561,000 ouncesNotesThe Red Lake Operation includes the of silver (Measured and Indicated Red Lake, Cochenour and Campbell December 2023) mining areas, and the Campbell and 1,388,000 tonnes graded at 2.76 g/t goldRed Lake processing plants. Both the and 2.58 g/t silver, containing 123,000Bateman mill and mine site are under ounces of gold and 115,000 ounces ofcare and maintenance. A key target silver (InferredDecember 2023) for the operation is to become cash-Opened 2017 positive with higher and consistent Life of Mine2031 production. Significant resources EmploymentApproximately 800 employees are continuing to be used to develop NotesThe Rainy River mine is locatedthe CYD decline and consolidation of approximately 65 km northwest of Forttailings. CYD decline provides access Frances, Ont. and includes both the mineto Upper Campbell, which will be one and the Rainy River processing plant.of the main contributors for ounces and Rainy River mine includes both an opentonnes for Evolutions FY26 and beyond. pit and underground mining. The MainEvolutions guidance for FY25 includes zone, which has historically been minedgold production of 125k-145k ounces from the open pit, began production fromwith an AISC of US$/oz 1,685-1,755. underground, with the first ore minedDuring the first three quarters of 2024, in September 2024. Additionally, atgold production was 100,727 ounces.the end of 2023, a Phase 5 portion was added to the open pit to be mined after 2026. During the first three quartersSUGAR ZONE MINE (TEMPORARILY SUSPENDED)of 2024, Rainy River produced 164,908Vault Minerals Ltd. gold ounces. Guidance for 2024 has an gold producer undergroundexpected production of 250k-280k gold ounces, at a AISC of US$/oz 1,425-1,525,Mailing AddressSouth Shore Centre, Suite 4, Level 3, 85 with a 2025 guidance of 295k-335kSouth Perth Esplanadegoldounces. South Perth, Western Australia6151Tel: +61 8 6313-3800Fax: +61 8 6313-3888RED LAKE MINEWebsitewww.vaultminerals.comEvolution Mining Ltd.Red Lake Gold Mines Production Rate1,400 tonnes per day (mine), 1,500gold producer underground tonnes per day (mill capacity)Production202151,453 ounces of goldMailing Address17 Mine Road, Bag 2000 202250,021 ounces of goldBalmertown, ONP0V 1C0 202323,587 ounces of gold Tel: (807) 735-2077 2024Not availableWebsitewww.evolutionmining.com.au Resources2,800,000 tonnes at 8.50 g/t containing Mine ManagerThomas Lethbridge, General Manager,768,000 ounces of gold (Measured and Red Lake Operations IndicatedJune 2024)Production Rate1900 tonnes per day (mill capacity) 2,032,000 tonnes at 7.80 g/t containing Production2021126,339 ounces of gold (fiscal year510,000 ounces of gold (InferredJune ending June 30, 2021)2024)2022115,276 ounces of gold (fiscal yearOpened 201916ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2025'