b'GOLD MINES DETOUR LAKE MINE EAGLE RIVER MINEAgnico Eagle Mines Ltd.Wesdome Gold Mines Ltd. gold producer open pitgold producer undergroundMailing Address86 2 ndStreet, End of HWY 652 Mailing Address93 Mission Road, P.O. Box 1520Cochrane, ONP0L 1C0 Wawa, ONP0S 1K0Tel: (647) 847-2089 Tel: (705) 856-2721Websitewww.agnicoeagle.com Fax: (705) 856-2986Mine ManagerBarry Kellar, General Manager Websitewww.wesdome.comProduction Rate76,700 tonnes per day (expected millMine ManagerMichael Wereszczynskythroughput) Production Rate1,200 tonnes per day (mill capacity) Production2021712,824 ounces of gold Production202199,120 ounces of gold2022732,572 ounces of gold 202279,997 ounces of gold2023677,446 ounces of gold202387,467 ounces of gold 2024690,000 ounces of gold202494,562 ounces of gold (management projection)2025105,000 ounces of gold 2025725,000 ounces of gold(management projection)(management projection)Resources1,487,000 tonnes at 13.4 g/t gold, Resources1,487,606,000 tonnes at 0.70 g/t gold,containing 646,000 ounces of gold containing 33,505,000 ounces of gold(Measured and IndicatedDecember (Measured and IndicatedMarch 2024) 2023)136,430,000 at 1.76 g/t gold, containing558,000 tonnes at 12.8 g/t gold, 7,704,000 ounces of gold (Inferred containing 229,0000 ounces of gold March 2024) (InferredDecember 2023)Opened2013 Opened1996Life of Mine2052 Life of Mine2027Employment1,484 employees Employmentapproximately 250 NotesAs of September 30, 2024, the DetourNotesThe Eagle River Complex includes the Lake mine had produced 492,889 oz atEagle River Mine and the past producing 0.84 g/t Au during 2024. As of DecemberMishi mine. The Eagle River Complex 31, 2022, Detour Lake had a combinedproduced 67,859 oz of Au at 13.4 g/t mineral reserve of 19.9 million ouncesfrom January to September 30, 2024. Au at a grade of 0.76 g/t. Additionally,Wesdome has completed 83,000 m of the company continued infill drilling indrilling across the Falcon 311, the 300, the West Pit extension, confirming gradethe 818 and the 6 Central zones so far and continuity of high-grade zones thatthis year. The Eagle River deposit has are part of the proposed underground400,000 oz Au at 17.38 g/t in reserve mining plan. A technical study released(Proven + Probable) and 246,000 oz Au in June supports the potential forin resource (Measured + Indicated) at underground operations to increase9.9 g/t Au, with a further 349,000 oz annual production to approximately 1at 3.8 g/t Au in inferred. Wesdome is Moz a year for 14 years, beginning inalso conducting regional exploration in 2030. Agnico Eagle has committed to athe Papa, Eagle River Splay Newt Lake, $100 million investment over three yearsMishi and No Name Lake targets.to develop an exploration ramp to allow for bulk sampling and infill drilling of the underground resource. The company hasGREENSTONE GOLD MINEconducted over 130,000 m of explorationEquinox Gold Corp.Greenstone Gold Mines LPdrilling in the first half of 2024, including gold producer open pitdrilling in the West Pit and West PitMailing Address7921 Highway 11, P.O. Bag 11Extension zones. Geraldton, ONP0T 1M0Tel: (888) 876-0283Websitewww.equinoxgold.comMine ManagerSimon FleuryProduction Rate145,000 tonnes per day (mine), 27,000 tonnes per day (mill capacity)Production2024111,710 ounces of gold 2025453,500 ounces of gold (management projection)Resources193,094,000 tonnes at 1.44 g/t gold, containing 9,007,000 ounces of gold (Measured and IndicatedJune 2024)33,819,000 tonnes at 2.81 g/t gold, containing 3,061,000 ounces of gold (InferredJune 2024)12ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2025'