b'GOLD MINES HOYLE POND MINE (PORCUPINE MINES) Production Rate1,200 tonnes per day (mine), 1,200 tonnes Newmont Corp.Porcupine Gold Mines per day (mill capacity) gold producer underground Production2021140,900 ounces of gold2022133,700 ounces of goldMailing Address4315 Gold Mine Road2023131,400 ounces of goldSouth Porcupine, ONP0N 1H0 2024131,400 ounces of goldTel: (705) 235-6589 2025287,500 ounces of gold Fax: (705) 235-6551 (management projection for Island Gold Websitewww.newmont.com and Magino combined)Mine ManagerDawid Pretorius, Mine General Manager,Resources7,762,000 tonnes at 9.78 g/t gold, Porcupine Mines Operations containing 2,441,000 ounces of gold Production Rate9,600 tonnes per day (Porcupine Mines(Measured and IndicatedDecember Operations combined), 9,979 tonnes per2023)day (mill capacity) 7,857,000 tonnes at 14.58 g/t gold, Production202172,448 ounces of goldcontaining 3,682,000 ounces of gold 202242,141 ounces of gold(InferredDecember 2023)202350,162 ounces of goldOpened20072024270,000 ounces of goldLife of Mine2045(management projection for PorcupineEmployment500 full-time employees and 500 Mines Operations combined) contractors 2025260,000 ounces of gold (estimateNotesAs of September 30, 2024, Island Gold for Porcupine Mines Operationsproduced 115,600 oz of Au at a head combined) grade of 12.97 g/t. As of December 31 st , Resources100,400,000 tonnes at 1.86 g/t gold,2023, Alamos reported reserves of 1.725 containing 6,000,000 ounces of goldmillion oz at a grade of 10.30 g/t and (Measured and IndicatedDecemberresources of 716 koz at 8.13 g/t Au. The 2023 for Porcupine Mines Operationsacquisition of Argonaut Gold by Alamos combined) was completed by July 2024, and the two 62,200,000 tonnes at 1.71 g/t gold,sites are expected to be fully integrated containing 3,400,000 ounces of goldand utilizing one centralized mill and (InferredDecember 2023 for Porcupinetailings facility beginning in 2025. The Mines Operations combined) Phase 3+ Expansion project is on track Opened1985 for completion in H1 2026. Components Life of Mine2025 of this project include the construction Employment764 full-time employees and 300of a paste plant, construction of a haul contract staff (for Porcupine Minesroad from Island Gold to the Magino Mill, Operations combined)the sinking of shaft to 812 m and the NotesThe Porcupine Mines operations includeconstruction of a headframe bin house.the Hoyle Pond, Hollinger and Borden Lake mines as well as the Dome mill. AsMACASSA MINEof September 30th, 2024, PorcupineAgnico Eagle Mines Ltd. Mines have produced 219,000 oz for this gold producer undergroundyear at a head grade of 3.322 g/t Au. As of December 31, 2023, Porcupine had aMailing Address1350 Government Road Westcombined reserve of 32.7 million tonnesKirkland Lake, ONP2N 3J1at a grade of 2.10 g/t Au for a total ofTel: (705) 567-52082.2 million oz Au and a resource of 67.7Websitewww.agnicoeagle.commillion tonnes at a grade of 1.74 g/t forMine ManagerMariana Pinheiro Harvey, General a total of 3.8 million oz. Production fromManagerthe past-producing Pamour open pit isProduction Rate2,000 tonnes per day (mill capacity)expected to provide lower-grade materialProduction2021210,192 ounces of goldto support higher-grade ore from Hoyle2022200,288 ounces of gold Pond and Borden. 2023228,535 ounces of gold 2024275,000 ounces of gold (management projection) ISLAND GOLD MINE 2025330,000 ounces of gold (ISLAND GOLD DISTRICT OPERATIONS)(management projection) Alamos Gold Inc. Resources7,463,000 tonnes at 11.60 g/t gold,gold producer underground containing 2,783,000 ounces of gold (Measured and IndicatedDecember Mailing Address15 Goudreau Road 2023) Dubreuilville, ONP0S 1B0 4,106,000 tonnes at 8.89 g/t gold, Tel: (705) 884-2805 containing 1,173,000 ounces of gold Websitewww.alamosgold.com (InferredDecember 2023)Mine ManagerAustin Hemphill, General ManagerOpened200214ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2025'