THE ONLY SOURCE FOR PROFESSIONAL ICI ROOFING CONTRACTORS IN ONTARIO ORN 20 ONTARIO ROOFING NEWS – ISSUE 3 2026 Option No. Description 1 Like-for-Like Single-Ply TPO Roof Membrane System 2 Two-ply Modified Bitumen SBS Roof Membrane System 3 PMMA Liquid-Applied Roof Membrane System Applied over One-ply Modified Bitumen SBS Base Sheet Table 2: Roof membrane design option. Blue Roofs conductive medium. ASTM Guide D7877 and ASTM Practice D8231 guided the electronic-detection- conductive medium selection and design.26,27 The conductive medium sits between the polyisocyanurate insulation and the asphaltic cover board, comprised of welded stainless steel mesh. In consultation with the roofing membrane manufacturer, the conductive medium was placed below the cover board instead of directly below the membrane sys- tem to protect the liquid-applied membrane. The mesh grid, spaced out at 50 mm by 50 mm (two in. by two in.), is connected through a contact plate and cable to a connec- tion box. During ELD testing, a low- voltage charge is applied through the connection box via a portable pulse generator. Roof Drainage and Scuppers The new replacement roof as- sembly included the following drainage scope to accommodate the blue roof mechanical system design. Figure 10 and Figure 11 illustrate the blue roof drains connecting to the mechanical systems below the roof deck. • Upgrade the primary roof field drains, including add- ing a field drain within the blue roof zone, to tie in the new roof assembly to the new blue roof mechanical sen- sors, valves and water treat- ment/storage systems below the deck. • Add new field overflow drains equipped with extension pipes rising above the roof membrane up to the maxi- mum planned blue roof wa- ter depth. • Add new overflow scuppers through the parapets set at the height of the maximum planned blue roof water depth. The primary roof field drains control flow and pond water, and when the blue roof is inactive (e.g., in the winter months), they provide primary drainage to meet building design. These drains were retrofitted to include vandal-proof cast aluminum domes and hinged access gates, pan-formed aluminum drain bodies and cast aluminum clamping rings. The retrofit drains connected to the rainwater lead- ers below the deck via mechanical coupling connections instead of U-flow friction insert seals, as the pipes may experience high flow rate and temporary backup conditions during blue roof drain down. The overflow field drains and scuppers divert water and meet the roof’s drainage requirements, if the levels on the blue roof reach maximum planned storage capac- ity. The overflow scuppers cut into the parapets’ drain through down- spouts terminating at grade, as il- lustrated in Figure 12. They were placed along the roof edge to make scuppers easier to inspect and were designed to complement the archi- tectural style of the building, inte- grating with the overall design. Construction Construction commenced with removal of the existing roof as- sembly, followed by adjustments to existing roof anchors to extend them above the maximum planned water level. Surface preparation in- cluded cleaning and priming of the existing concrete surface for vapour barrier application, while insulation was installed staggered and tightly butted. ELD conductive medium mesh was installed followed by cover board and one-ply modified- bitumen SBS base sheet. Surface cleaning was carried out to remove any loose granules, dust or dirt prior to the liquid-applied PMMA system application. PMMA sys- tem application is sensitive to high temperatures, which could lead to improper curing. Ambient and substrate temperatures were closely monitored throughout the process to verify application onditions. Uncovered concealed conditions during construction, including original structural roof deck pre- cast panels construction tolerances, required some modifications to overflow drain and scupper levels to meet planned blue roof design wa- ter storage capacity loads. Multiple methods to validate final installed new roof membrane levels were employed. Based on these actual site conditions, final blue roof water storage volume and overflow drain- age heights were confirmed. Hand tape measurements, laser levels and total station surveys were com- pleted during several stages during new roof assembly construction to confirm that the planned maxi- mum storage capacity water levels were maintained. After construction was com- pleted and installation was commis- sioned, blue roof water flood testing was conducted to validate the roof and flow control systems integrity. Mobile truck pumped 16,000 L (4,200 gal.) of water onto the roof, and a systematic monitoring pro- gram was implemented to confirm the absence of leaks and proper op- erations of the mechanical systems. Discussion Implementing this blue roof pilot project at the CVC Head Of- fice in Mississauga is testing this emerging and innovative approach to urban water management and climate resilience. It provides valu- able insights into the feasibility and practicality of blue roof installations in municipal settings, highlighting benefits and challenges encountered during the design and construc- tion phases. The pilot project incorporated an ongoing maintenance and moni- toring program. The mechanical system includes drain sensors and control instruments to regulate flow. These components are sched- uled for regular maintenance and monitoring to ensure proper per- formance. The roof assembly’s em- bedded EFVM conductive medium allows for regular testing for mois- ture ingress and diagnostics in case of leaks. Blue roofs, by design, increase the risk by intentionally ponding water. Structural load analysis, and incor- porating redundancy and fail-safe mechanisms to the design, manages the risks. The design includes two separate types of overflow drainage pathways (i.e., scuppers and drain- pipes) to prevent water accumula- tion beyond safe levels. The roof membrane system and the drain sen- sors include intentional redundancy to manage risks over the lifecycle Commercial and Residential Roofing Trinity Roofing Ltd. specializes in a variety of roofing applications and waterproofing for residential, commercial and institutional buildings. Phone: 416-630-9213 Fax: 416-630-1722 URL: www.trinitycanada.com Email: info@trinitycanada.com Call For A Quote 651-398-3029 emiroofvacs.com LEADERS IN ROOF VACUUM SALES
View this content as a flipbook by clicking here.