THE ONLY SOURCE FOR PROFESSIONAL ICI ROOFING CONTRACTORS IN ONTARIO ORN 18 ONTARIO ROOFING NEWS – ISSUE 3 2026 Figure 7: Superimposed dead load SDL cross-section diagram. Figure 8: Roof plan. technology, imposes a variable load due to rain. Importantly, OBC Ar- ticle 4.1.6.4.(3) specifies that snow and rain loads do not coincide and should not be combined in the same load calculation.21 Consequently, the capacity of an existing roof to support a rainwater storage capacity is equal to the design snow or rain load. Based on the 2012 OBC and regional precipitation data, hydrau- lic rain load calculations indicate that snow load typically governs de- sign in Mississauga and Toronto, as shown in Table 1. It is common practice that an increase of up to five per cent in variable load is acceptable without requiring structural reinforcement, translating to increasing ponding from 130 mm (five in.) to 137 mm (5.4 in.) in Mississauga. However, CVC’s requirement to store up to the maximum allowable amount of water necessitated a detailed assess- ment and potential roof structural reinforcement. Design loads for the Roof A-1 were calculated, factoring a basic snow load of 1.3 kPa, wind uplift of 1.3 kPa and a basic super- imposed dead load (SDL) of 1.6 kPa. Additionally, the average slop- ing topping dead load was 4.7 kPa, varying from 2.8 kPa to 6.6 kPa, as shown in Figure 7. Accordingly, it was determined that the existing low-sloped roof can support basic seasonal blue roof technology without additional rein- forcement, with a maximum snow load of 1.3 kPa plus 0.6 kPa in al- lowances or a maximum ponding depth of 180 mm (seven in.). The blue roof system drains should re- main open to avoid ponding during the winter months. Roof Assembly Considering Roof A-1’s existing TPO roof assembly condition and performance risks, full roof replace- ment as part of the blue roof pilot was contemplated. Roof cut tests completed by CVC’s roofing con- tractor confirmed moisture present below the existing TPO membrane at several locations. Concerns were raised regarding risks and the im- pact of future leaks below the new blue roof, including building op- erations disruption and hollow core structural roof slab deterioration. CVC elected to replace the full roof assembly as part of the blue roof project. Considerations and factors reviewed in making final new roof system design decisions are present- ed below. Blue Roofs Design Overview To implement the blue roof proj- ect on Roof A-1, a separation was needed to isolate existing rooftop building mechanical and weather- monitoring instrumentation sys- tems installed on the west section of the roof. Roof A-1 was divided by a new segregation barrier into two dis- tinct areas: Zone 1 (the western third of the roof, which is to remain a con- ventionally drained low-sloped roof) and Zone 2 (the eastern remaining roof area designated for blue roof water retention), as depicted in Fig- ure 8. Zone 3, the lower garage roof (Roof A-2), falls outside this proj- ect’s scope. Roof Assembly The new replacement roof assem- bly at Zone 2 (the blue roof area), as a retrofit, was to at least achieve the same thermal and condensation re- sistance performance levels of the ex- isting TPO roof. Additional design decisions were guided by four key objectives established by the CVC. First was ensuring the new roof as- sembly could allow for and perform under planned maximum water stor- age volumes, above the membrane, for prolonged periods outside of winter conditions. The second ob- jective was maintaining the high- reflectivity white roof membrane surfacing design feature to reduce solar heat gain and building cooling energy loads. The third objective required that the roof membrane not impact the stored water’s qual- ity and resist potential chlorine and algaecide water treatment ad- ditives. Finally, the roof membrane needed to withstand light foot traf- fic for demonstration and mainte- nance purposes. For the new roof membrane, the design team considered fully ad- hered membranes with redundant, multi-ply and seamless applications to improve leak resistance and roof durability. A summary of the op- tions reviewed is provided in Table 2. All options included the same in- sulation and vapour barrier details. Given the following consider- ations, the Option 3 roof assembly, including a PMMA liquid-applied membrane system over a one-ply modified-bitumen SBS base sheet, was ultimately selected. • The PMMA liquid-applied membrane is installed in a seamless application and can withstand the ponded water hydrostatic pressure antici- pated in the RID blue roof City Snow (without considering snow drift) Water Loading kPa (psf) Precipitation mm (in.) Loading kPa (psf) Precipitation mm (in.) Mississauga 1.28 (27) 130 (5.1) 1.11 (23) 113 (4.4) Toronto 1.12 (23) 114 (4.5) 0.95 (19) 97 (3.8) Table 1: Snow and rain loads as per Table 4.1.2.1A in 2012 OBC.21
View this content as a flipbook by clicking here.