ORN THE ONLY SOURCE FOR PROFESSIONAL ICI ROOFING CONTRACTORS IN ONTARIO ONTARIO ROOFING NEWS – ISSUE 3 2026 17 Building A was designed in 2008 by Montgomery Sisam Archi- tects Inc. Accordingly, the 2006 Ontario Building Code was the applicable building code at the time of design and permit issu- ance. Design loading was in ac- cordance with Part 4 of Division B. Environmental loading data for Mississauga was per Supple- mentary Standard SB-1. Feasibility Study Project Background In October 2017, the CVC authority began exploring the feasibility of implementing an RID blue-roof pilot project in- stallation at their office building. This pilot project was seen as an opportunity to test the effective- ness of this emerging technology in managing storm peak load, re- ducing energy consumption and determining the non-potable demand that could be met by the existing rainwater harvesting (RWH) system.10 Over the fol- lowing months, CVC engaged with internal and external stake- holders to refine the project con- cept and secure funding. Due to its size and relatively minimal mechanical and conduit conges- tion, Roof A-1 was identified as a candidate for the installation of the blue roof system. In light of the prevailing code regulations in 2017, which al- lowed a maximum rainwater drain-down time of 24 hours per day and a maximum roof rain- water level of 150 mm (six in.), CVC entered pre-consultation and technical discussions with the City of Mississauga Building Department to determine the legislative requirements for a blue roof. In addition to complying with the general requirements of the OBC, two alternative solu- tions were proposed under OBC Division C to maximize the ben- efits of a blue roof. The first alternative, Solu- tion A, proposed extending the maximum allowable rainwater drain-down time to six days. This extension aimed to increase the amount of water stored while also including provisions for re- ducing the likelihood of mould or mildew growth and the risk of illness from unsanitary con- ditions caused by contaminat- ed surfaces and vermin.29 This latter concern was particularly pertinent in relation to Culex mosquitoes, whose larval de- velopment cycle can be as early as five days with favourable en- vironmental conditions.30 Cu- lex mosquitoes in this region are known to carry the West Nile virus, and stagnant water without treatment may lead to increased larval development, potentially spreading the dis- ease.31 According to this alter- native solution, all accumu- lated rainwater must be treated every two days per CSA B805 standards to control bacteria and protozoa.28,29 The second alternative, Solution B, suggested increas- ing the maximum allowable roof rainwater level from 150 mm (six in.) to 250 mm (10 in.). The City of Mississauga requested a detailed structural assessment and the inclusion of additional overflow scup- pers to manage this increased capacity and alleviate the risk of structural overloading on the existing structure. Structural The original structural deck was designed to accom- modate dead, live, variable and wind loads, according to OBC 2012, Table 4.1.2.1.A. Dead loads include the self-weight of the structure, permanent construction materials, roof assembly, overburden, rooftop equipment and architectural components. Live and variable loads account for occupants, movable equipment and en- vironmental factors such as snow, ice and rain. For most roof structures, the variable snow or rain load is equal to or greater than the dead load, with the dead load calculated at 1.25 kPa (26 psf) and the vari- able load at 1.5 kPa (31 psf), per OBC Table 4.1.3.2.A.21 The rainwater storage ca- pacity, integral to blue roof While prototypes exist for tray systems, check-dammed systems and blue-green roofs, limited research and case studies exist for RID systems, flagging a potential area for further research and development.
View this content as a flipbook by clicking here.