Blue Roofs
performance during the 2021 grow-
ing season at the George Vari Engi-
neering and Computing Centre at 
the Toronto Metropolitan Univer-
sity. The roof was comprised of a 
50-mm compost layer, a 250-mm 
substrate, a filter sheet, a 50-mm 
drainage layer, a root barrier and a 
roofing membrane arranged from 
top to bottom. The membrane and 
drain system were not mentioned in 
the study. The research highlighted 
the roof’s water retention capabil-
ity, with average rates between 85 
and 88 per cent and peak stormwater 
attenuation of 82 to 85 per cent.19 
Temperature-wise, the study ob-
served a mean air temperature reduc-
tion of 1.4°C to 2.5°C, varying with 
the type of vegetation.19 Notably, the 
cooling effects were more significant 
in the afternoon and evening, while 
a warming trend was noted in the 
early morning.19
While prototypes exist for tray 
systems, check-dammed systems and 
blue-green roofs, limited research 
and case studies exist for RID sys-
tems, flagging a potential area for 
further research and development. 
This gap in research limits practitio-
ners’ understanding of RID systems 
and their performance across various 
membrane types.
Relevant Canadian Codes 
and Standards
While specific standards for blue 
roofs have yet to be established 
within Canadian building codes and 
standards, the principles for gen-
eral roof design remain pertinent. 
This section examines how existing 
roofing codes and standards can be 
adapted to blue roof applications, 
ensuring their functional and struc-
tural integrity.
The 2020 National Plumbing 
Code (NPC) contains provisions for 
roof drainage relevant to blue roofs. 
Section 2.4.10.4(1) determines the 
maximum hydraulic load used to es-
tablish the minimum leader size for 
the roof drain. For roof drains with 
flow controls, the hydraulic load is 
determined using a 25-year rainfall 
intensity-duration-frequency curve 
provided by Environment Canada.20 
NPC clauses 2.4.10.4(2) and (3) 
stipulate that water stored on the 
roof should not remain for more 
than 24 hours and have a maximum 
depth of 150 mm (six in.).20 Ad-
ditional clauses in the NBC 2015 
specify the location of drains, which 
must be no more than 15 m (49 ft.) 
from the edge of the roof and no 
more than 30 m (98 ft.) from adja-
cent drains.20 Additionally, overflow 
scuppers must be installed no more 
than 30 m (98 ft.) apart along the 
perimeter of the building to prevent 
structural overloading of the roof 
if drains fail.20 However, the NPC 
does not mandate specific roofing 
membranes.
Many regionally specific codes, 
such as the 2012 Ontario Building 
Code (OBC), share requirements 
comparable to those of the NPC 
drainage guidance. The distinction 
lies in the sourcing of environmen-
tal data, where references in the 
OBC must adhere to the Ministry 
of Municipal Affairs and Housing 
(MMAH) Supplementary Standard 
SB-1 instead of NPC data.21
Different municipalities and re-
gions may also have specific storm-
water management and retention 
requirements. For example, the To-
ronto Green Standard (TGS) Ver-
sion 4 applies to new site plan ap-
plications for four-storey or higher 
residential buildings and all indus-
trial, commercial and institutional 
(ICI) developments.22 Within the 
water quality and efficiency pre-
requisite WQ1.1, Water Balance, 
Quality & Quantity Control, there 
is a mandate to retain 50 per cent 
of the total average annual rainfall 
volume, remove 80 per cent of to-
tal suspended solids and control E. 
coli for discharges to Lake Ontario 
or waterfront sites.22 Peak flow con-
trol is also required; however, chal-
lenges arise in implementing blue 
roofs under prerequisite WQ1.3, 
On-site Green Infrastructure, due 
to conflicting requirements, such as 
minimum vegetative roof coverage, 
which can be up to 80 per cent of 
available roof space.22 These require-
ments pose challenges in blue roof 
implementation, with the standard 
specifications supporting vegetative 
roof infrastructure. Designers may 
consider implementing blue roofs 
in the remaining available roof space 
or installing a hybrid blue-green 
roof to meet the Toronto bylaw re-
quirements. The City of Toronto 
also has a Wet Weather Flow Master 
Plan, which sets wet-weather flow-
management targets for water bal-
ance, quality and quantity. Table 1 
in Section 2.2.1, Water Balance, lists 
examples of on-site stormwater man-
agement practices depending on the 
type of land use.23 For example, com-
mercial and industrial buildings may 
implement vegetative roofs, rooftop 
restrictors and rainwater harvesting.
CSA A123.26:21, Performance 
Requirements for Climate Resilience 
of Low Slope Membrane Roofing Sys-
tems, lists even more stringent rec-
ommendations related to drainage. 
The standard outlines the require-
ments for low-sloped membrane 
roofing systems to achieve different 
ratings related to climate adaptation. 
According to Clause 7.2.8, water 
should not run more than 10.7 m 
(35 ft.) to a primary drain or scup-
per to achieve a silver performance 
rating.24 For a gold performance 
rating, Clause 7.2.13 stipulates that 
water should not travel more than 
6.1 m (20 ft.) to a primary drain 
or scupper.24
CSA 478:19, Durability in 
Buildings, provides minimum re-
quirements to assist designers in 
making design decisions, review-
ing construction and performing 
building maintenance in existing 
and new construction projects.25 
Blue roofs can influence the lifes-
pan and performance of a building 
due to their unique construction 
and environment. For example, 
Sections 4.3 and 4.4 of this stan-
dard state that all foreseeable agents 
and mechanisms that could impact 
durability and performance must 
be considered and accounted for 
during design, construction, re-
pair and maintenance.25 Similarly, 
Section 8.3, Clauses (b) and (c), 
specify that the materials selected 
must be appropriate for the struc-
ture’s environment, design loads 
and differential movements.25 Sec-
tion 4.6.2 stipulates that a mainte-
nance and inspection plan should 
be developed for building compo-
nents, including repair and replace-
ment.25 This makes proper mate-
rial selection for the waterproofing 
membrane and a thorough mainte-
nance and repair plan essential for 
blue  roofs.
Leak detection is an important 
consideration for blue roof systems. 
It can provide quality assurance 
during construction and a mean of 
leak diagnostics and monitoring for 
the lifecycle of the roof assembly. In 
considering leak detection during 
design, the following standards of-
fer guidelines and requirements for 
electronic-detection 
components: 
ASTM D7877, Standard Guide 
for Electronic Methods for Detecting 
and Locating Leaks in Waterproof 
Membranes, and ASTM D823, 
Standard Practice for the Use of a 
Low Voltage Electronic Scanning 
System for Detecting and Locating 
Breaches in Roofing and Water-
proofing Membranes.26,27
Lastly, 
CSA 
B805:22/ICC 
805:22, 
Rainwater 
Harvesting 
Systems, provides comprehensive 
guidelines for the design, materials, 
installation and operation of rain-
water harvesting systems, covering 
potable and non-potable applica-
tions and water treatment.28 It can 
apply to blue roofs if detained water 
is reused within the building for po-
table or non-potable uses.
Case Study
Building Description
The Credit Valley Conserva-
tion (CVC) Head Office, located at 
1255 Old Derry Road in Mississauga, 
Ont., consists of two buildings, A 
and B, connected by a one-storey cor-
ridor. Constructed circa 2010, Build-
ing A is a four-storey steel-framed 
structure with a one-storey garage 
on the southeast elevation (Figures 
3 and 4). The floors and roof slabs 
are supported by steel beams con-
nected to steel columns anchored to 
cast-in-place footings. Building A has 
three roof sections: the main roof 
(A-1), the garage roof (A-2) and the 
elevator pit room (A-3), as shown in 
Figure 5. Mechanical equipment on 
the west side of roof A-1 sits within 
an open-air screen enclosure. The ap-
proximate area of roof A-1 is 645 m2 
(6,943 ft.2).
The main roof structure of Roof 
A-1 is a 250-mm (10-in.) thick hol-
low-core slab. On top of the slab is 
a concrete topping that measures 
230 mm (nine in.) at the perimeter, 
tapering to 50 mm (two in.) at the 
centre to facilitate drainage. The ex-
isting roof assembly is a conventional 
system that includes a self-adhered 
vapour barrier, 125 mm (five in.) of 
EPS insulation adhered in place and 
a 12.7-mm (1/2-in.) fibre board ad-
hered in place. The system is capped 
with a single-ply fully adhered TPO 
membrane, as depicted in Figure 6.
Roof A-1 does not have over-
flow scuppers. The existing parapet 
height is 400 mm (16 in.). Building 
A has seven drains. CVC Head Office 
Figure 5: Building A – existing roof plan.
Figure 6: Existing A-1 roof assembly.