b'FORCE MAJEUREThis term has been tossed about quite a lot lately. Basically, it means that a contract can no longer be executed because there were intervening and extraordinary circumstances, sometimes referred to as acts of God, that were not, or perhaps could not, have been contemplated. These could include fires, labour disputes, strikes, lockouts, diseases, plagues and epidemics. Under the heading of epidemics, certainly COVID-19 has been declared a worldwide pandemic; but does that make it a claimable event? There are no clear answers, but here are just some thoughts on the matter: 1. A CCDC 2 Contract has General Condition (CG) 6.5 regardingdelays and costs. That clause can guide a claim or response subject to Supplementary General Conditions (SGC).2.Force majeure in the manner of a pandemic that may trigger delays and/or costs can be informed by CG 6.5 or amending SGC. Total Enclosure Sail System3.While a force majeure event may have occurred, the occurrence may not have sufficient grounds for a claim or counterclaim. Details such as foreseeability, ability to alter an agreement, ability to mitigate costs and effort to mitigate costs all weigh into anyclaim.4. One must also consider the significance of any change in costs.Would a 10 per cent increase in cost be claimable as a response to a force majeure event? How about 20 per cent or 50 per cent?5.If work is only delayed and not terminated, is the delay within the total non-critical path period of a project, or is it just an extension of certain critical path periods? What is the actual extended period?6.If the work is terminated due to a force majeure event and the termination is invoked by the building owner/manager (in the case of the window installation) or by the occupant (in the case of the painter), can these contractor(s) claim lost opportunity costs, lost income, overhead and profit on the project, and/or overhead on the costs to maintain their office?7.If the work is terminated by the window contractor, can the owner/manager claim costs for delay or 3rd party claims from occupants passed along as the added costs to do thepainting? Courtesy of Scafom8.Does the understanding between the occupant and the owner/manager constitute a contract that can trigger aclaim?9.Can any of these matters be claimed against business operations insurance? 10.Do government measures trump all or any commercial arrangements in contracts affected by COVID-19?11.Does the government have any liability for possible failure to protect citizens against effects of a pandemic-type, forceSail System is the majeure-type event, and to what degree was it foreseeable?premier scaffold based enclosure 12.Can the government be held financially responsible forsystem for weather protection, environmental frustration of the commercial arrangements and associated costs? containment and graphics projects. Sail System attaches simply Like everything else we do, the actions we agree to take and accept inand efficiently to scaffold and offers an array of fabric options.a contract are based on the type and amount of risk we will take andThe Sail system is: Primary uses:how much that risk is worth. But what if you do not know the risks? DurableBuilding EnclosuresShipyard containment WHO SHOULD BE AT RISK?ReusableBridge containment Industrial enclosuresContracts are really all about doing something in return for EfficientWater tower containmentand wind wallsGraphic applicationssomething else (illegal activities excluded). When nobody else Cost effectiveGround tank containment intervenes in a contract, there is supposed to be an ability for the parties to understand the expectations and the rewards in those contracts. In that way, they can decide how the risks can be divviedContact us to discuss your next enclosure or containment project.up. Normally, if you assume more risk, that is worth more than if youinfo@sailsystem.com|www.sailsystem.com assumed less risk. Ph: 800-SAIL-710(800-724-5710)ACCESS CANADA SPRING/SUMMER 202015'