b'FRASER MINE (PRODUCTION CEASED) TOMCLID IRON MINE H E R M E S L M I N E OT TAManagerChristian Bruneau, Mine Director Ferromin Inc.Production Rate553,033 tonnes per year (2024)iron as magnetitequarryOpened 1963Life of Mine2025 Mailing Address158 Don Hillock Drive, Unit 13Aurora, ONL4G 0H6NICKEL RIM SOUTH MINE (CLOSED)Tel: (905) 727-7100ManagerGary Potts, Mine Director Fax: (905) 727-0060Production Rate320,160 tonnes per year (2024) Websitewww.ferromininc.comOpened2009 Production2022Not availableLife of Mine2024 2023Not available2024Not available 2025Not available ONAPING DEPTH PROJECT (PRE-PRODUCTION)2026Not available ManagerGreg Maybee, Mine Director Resources 3 million tonnes averaging 40-per-cent Production Rate72,182 tonnes per year (2024) Fe (1993); reserves estimate has not been Opened2026 (expected) adjusted to reflect production fromLife of Mine2035 the depositOpened1997 (reopened on an as-needed basis)NotesProduction was restarted in late 1997 by Tomclid Iron Mines Ltd. and operations have continued on an as-needed basis by Ferromin Inc. Magnetite is mined and crushed as high-density aggregate for use in heavy concrete applications including radiation shielding. ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2026 23'