b'OTHER METAL MINEStotal workforce)SUDBURY INTEGRATED NICKEL OPERATIONSGLENCORENotesVale Base Metals Ontario OperationsFraser Mine include six active (Nickel-Copper-PGE)Glencore PLCGlencore Canadamine complexes, the Clarabelle mill, nickel, copper, cobalt, platinum group metals, sulphuric acid the Copper Cliff smelter and Copper undergroundCliff Nickel refinery as well as a cobalt and precious metals refinery in PortMailing Address6 Edison RoadColborne. The Stobie Pit opened onFalconbridge, ONP0M 1S0the Stobie Mine property in 2025. TheTel: (705) 693-2761Copper Cliff Complex consists of theWebsitewww.glencore.caNorth and South mines, which connectProduction Rate6,670 tonnes per day (mill capacity)more than 12 km of tunnels betweenProduction202116,661 tonnes nickel,the south and north shafts of Copper15,675 tonnes copper, 348 tonnesCliff Mine. The Complex is anticipatedcobalt (estimate)to have 20 years of mine life. Copper202216,661 tonnes nickel,CliffPhases 3 & 4 are under study, as is15,675 tonnes copper, 348 tonnesCreightonPhase 5, and the Copper Cliffcobalt (estimate)pit is in the pre-feasibility study stage.202314,693 tonnes nickel,All projects in a study phase require Vale16,575 tonnes copper, 286 tonnesBoard of Directors approval to proceed.cobalt (estimate)Collaborative discussions with Glencore202414,500 tonnes nickel,Canada are underway for projects16,500 tonnes copper, 300 tonneslocated in proximity to Glencores Nickelcobalt (estimate)Rim South mine infrastructure. Resources45,400,000 tonnes at 2.60-per-cent nickel, containing 1,200,000 tonnes of COLEMAN MINE nickel, 1.75-per-cent copper, containing Mine Manager Gary Annett 800,000 tonnes of copper, 0.06-per-cent Production Rate875,000 tonnes per year (2023) cobalt, containing 25,000 of tonnes Opened1970 (initial)cobalt, 0.94 g/t platinum, containing Life of Mine2043 1,500,000 ounces of platinum, and 1.70 g/t palladium, containing 2,600,000 of palladium (Measured and Indicated COPPER CLIFF COMPLEX December 2024)Mine Manager Stephanie Bleker 60,000,000 tonnes at 1.46-per-cent Production Rate1,019,000 tonnes per year (2024) nickel, containing 880,000 tonnes of Opened 1886 nickel, 1.63-per-cent copper, containing Life of Mine2044 980,000 tonnes of copper, 0.03-per-cent cobalt, containing 18,000 of tonnes CREIGHTON MINE cobalt, 0.69 g/t platinum, containing Mine Manager Derek Kulyski 1,300,000 ounces of platinum, and 1.10 Production Rate491,000 tonnes per year (2024) g/t palladium, containing 2,100,000 of Opened 1901 palladium (InferredDecember 2024)Life of Mine2044 Employment2,400 employeesNotesGlencores Sudbury Integrated Nickel Operations consist of the Onaping Depth GARSON MINE underground (Nickel-Copper-PGE) Mine Manager Nathan Farrow mine (being mined through the past-Production Rate791,000 tonnes per year (2024) producing Craig Mine infrastructure), the Opened 1907-1986; 1993 (reopened) Strathcona Mill and the Falconbridge Life of Mine2025-2044 Smelter. Nickel matte produced at the smelter is shipped to the companys STOBIE MINE Nikkelverk Refinery in Norway for Mine Manager Joel Villeneuve refining. The Fraser Mine closed in Production Rate115,000 tonnes per year (2024) late 2025. The Onaping Depth Mine is Opened 1890, 1914-2017; 2024 (reopened) expected to reach full production in Life of Mine2027 2026 and to extend Glencores Sudbury operations through 2040. The Nickel Rim South mine was put into care-and-TOTTEN MINE maintenance in 2024. Collaborative Mine Manager Alan Vermeersch discussions with Vale Base Metals Production Rate558,000 tonnes per year (2024) are underway for projects located in Opened 2014 proximity to the Nickel Rim SouthLife of Mine2044 mine infrastructure. 22ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2026'