b'GOLD MINES ISLAND GOLD MINE MACASSA MINE(ISLAND GOLD DISTRICT OPERATIONS)Agnico Eagle Mines Ltd. Alamos Gold Inc.gold producerunderground gold producerunderground Mailing Address1350 Government Road WestMailing Address15 Goudreau Road Kirkland Lake, ONP2N 3J1Dubreuilville, ONP0S 1B0 Tel: (705) 567-5208Tel: (705) 884-2805 Websitewww.agnicoeagle.comWebsitewww.alamosgold.com Mine ManagerMariana Pinheiro Harvey,Mine ManagerAustin Hemphill, General ManagerGeneral ManagerProduction Rate1,200 tonnes per day (mine), 1,200 tonnesProduction Rate2,000 tonnes per day (mill capacity)per day (mill capacity) Production2021210,192 ounces of goldProduction2021140,900 ounces of gold 2022200,288 ounces of gold 2022133,700 ounces of gold 2023228,535 ounces of gold 2023131,400 ounces of gold 2024279,384 ounces of gold2024155,000 ounces of gold 2025310,000 ounces of gold 2025265,000 ounces of gold(management projection)(management projection for Island GoldResources10,449,000 tonnes at 8.52 g/t gold, District combined) containing 2,862,000 ounces of gold Resources152,022,000 tonnes at 1.89 g/t gold,(Measured and Indicated containing 9,152,000 ounces of goldDecember 2024) (Measured and IndicatedDecember5,520,000 tonnes at 7.44 g/t gold, 2024 for Island Gold District combined) containing 1,322,000 ounces of gold 42,740,000 tonnes at 1.84 g/t gold,(InferredDecember 2024)containing 2,520,000 ounces of goldOpened2002(InferredDecember 2024) Life of Mine2031Opened2007 Employment889 employees Life of Mine2044 NotesDuring the first nine months of 2025, Employment500 full-time employees and Macassa mine produced 252,224 oz 500 contractorsof Au, from 424,000 tonnes of ore NotesIsland Gold District includes Islandgrading at 18.98 g/t gold, representing a Gold Mine and Magino Gold Mine. As24.2-per-cent increase in gold production of September 30, 2025, Island Goldcompared to the same period in 2024. produced 90,598 oz of Au at a headTotal gold production in 2025 at Macassa grade of 12.03 g/t. As of December 31,is expected to be between 300,000 and 2024, Island Gold Mine has 4,107 Koz320,000 ounces. Proven and Probable Au at 10.85 g/t in Reserve (Proven +mineral reserves as of December 31, Probable) and 1,049 Koz Au at 10.49 g/t2024, are reported as 2,074,000 ounces Au in Resource (Measured + Indicated),of gold contained in 7,027,000 tonnes with a further 1,239 Koz at 16.88 g/tof ore grading at 9.18 g/t gold, which Au in Inferred. In 2025, Alamos filedincludes the nearby Macassa Near a technical report for the Base CaseSurface and Amalgamated Kirkland (AK) Life of Mine Plan, completed on thedeposits. Construction of the new paste Island Gold District operation, located inplant continued during the third quarter Ontario, Canada. In August, explorationof 2025 and is essentially complete. drilling continues to extend high-gradeOperational readiness and testing are gold mineralization across the Islandongoing with completion expected in Gold Deposit, as well as within severalDecember 2025. hanging wall and footwall structures.14ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2026'