b'GOLD MINESBELL CREEK MINE (TIMMINS OPERATIONS) BLACK FOX MINE (BLACK FOX COMPLEX)Pan American Silver Corp.Lake Shore Gold Corp. McEwen Mining Inc. gold producerundergroundgold producerundergroundMailing Address3160 Florence Street, PO Box 1067 Mailing Address2839 Hwy 101 East, PO Box 605South Porcupine, ONP4N 7H9 Matheson, ONP0K 1N0Tel: (705) 269-4344 Tel: (705) 273-1077Websitewww.panamericansilver.com Fax: (705) 273-1097Mine ManagerRick Blakey Websitewww.mcewenmining.comProduction Rate4,458 tonnes per day (Bell Creek andMine ManagerPeter Mah, Chief Operating Officer Timmins West mines combined), 5,359Production Rate645 tonnes per day (mine), 2,000 tonnes tonnes per day (mill capacity) per day (mill capacity)Production2018167,500 (management projectionProduction201848,889 ounces of goldfor Bell Creek and Timmins West mines201935,693 ounces of goldcombined) 202024,353 ounces of gold2019143,770 (Bell Creek and Timmins202130,016 ounces of goldWest mines combined) 202246,500 ounces of gold (manage-2020148,400 (Bell Creek and Timminsment projection)West mines combined) Resources13,820,000 tonnes at 4.25 g/t containing 2021133,800 (Bell Creek and Timmins1,888,000 ounces of gold (Measured and West mines combined) IndicatedDec 2021)2022151,555 (standardized estimate3,966,000 tonnes at 3.89 g/t containing for Bell Creek and Timmins West mines495,000 ounces of gold (InferredDec combined) 2021)Resources6,900,000 tonnes at 3.00 g/t containingOpened2009 (open pit, closed 2015), 2011 (under-665,000 ounces of gold (Measured andground)IndicatedJun 2021)Employment257174,000 tonnes at 4.36 g/t containingNotesOre from Black Fox mine is processed at 24,300 ounces of gold (InferredJunthe Fox mill. Production comes from the 2021) Froome mine, which was developed in Opened2012 2020-2021 and started commercial pro-EmploymentApproximately 680 employees at Tim- duction in September 2021. In early 2022, mins Operations a preliminary economic assessment NotesOre from the Bell Creek and Timmins(PEA) was released evaluating an expan-West mines is processed at the Bellsion of the Fox mill to 2,400 tonnes per Creek mill, forming the Timmins Op- day and the development at the Stock erations. At Timmins Operations, overWest, Grey Fox, and Fuller deposits. The 200,000 ounces of gold were added toPEA outlined a 12-year mine life with pro-mineral reserves in 2021, extending theduction averaging approximately 72,000 mine life by more than one year. The Bellounces per year and approximately Creek mine contributed 68,000 of the100,000 ounces per year over years 6-10.additional ounces of gold as a result of exploration and infill drilling conducted in 2021. BORDEN GOLD MINE (PORCUPINE MINES)Newmont Corp. gold producerunderground, open pitMailing Address4315 Gold Mine Road, PO Box 70South Porcupine, ONP0N 1H0Tel: (705) 235-6589For weather equipment that works as hard as you do Fax: (705) 235-6551Websitewww.newmont.comMine ManagerMarc Lauzier, Mine General Manager, Porcupine MinesProduction Rate9,600 tonnes per day (Porcupine Mines Operations combined), 9,979 tonnes per day (mill capacity)Production2019223,000 ounces of gold (since the completion of the acquisition of the mine site as part of the Newmont Goldcorp Were serious about the weather transaction for Porcupine Mines Opera-tions combined)PO Box 900, Ignace, ONP0T 1T0(807) 934 8403|www.signalweather.ca8ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2022'