b'OTHER METAL MINESSUDBURY OPERATIONSGLENCORE FRASER MINEFraser Mine, Nickel Rim South Mine ManagerChristian Bruneau, Mine DirectorGlencore PLC Production Rate608,832 tonnes per year nickel, copper, cobalt, platinum group metals, Opened 1968 sulphuric acidNICKEL RIM SOUTH MINE underground ManagerDustin Ceretti, DirectorProduction Rate1,251,856 tonnes per yearMailing Address6 Edison Road Opened2010Falconbridge, ONP0M 1S0Tel: (705) 693-2761 TOMCLID IRON MINEFax: (705) 966-6530 Ferromin Inc.Websitewww.glencore.com, www.glencore.cairon as magnetitequarryProduction Rate6,670 tonnes per dayProduction201822,806 tonnes nickel, 38,831 tonnes copper, 477 tonnes cobalt (esti- Mailing Address158 Don Hillock Drive, Unit 13mate) Aurora, ON L4G 0H6201921,600 tonnes nickel, 33,000Tel: (905) 727-7100tonnes copper, 452 tonnes cobalt (esti- Fax: (905) 727-0060mate) Websitewww.ferromininc.com202018,910 tonnes nickel, 24,483Production20180 tonnes of oretonnes copper, 396 tonnes cobalt (esti- 2019Not availablemate) 2020Not available202116,661 tonnes nickel, 15,6752021Not availabletonnes copper, 348 tonnes cobalt (esti- 2022Not availablemate) Resources 3 million tonnes averaging 40% Fe 202216,400 tonnes nickel, 21,800(1993); reserves estimate has not been tonnes copper, 348 tonnes cobalt (esti- adjusted to reflect production from the mate) depositResources51,900,000 tonnes at 2.49% nickel, 1.61%Opened1997 (reopened on an as-needed basis)copper, 0.05% cobalt, 1.58 g/t palladium,NotesProduction was restarted in late 1997 by 0.89 g/t platinum (Measured and Indicat- Tomclid Iron Mines Ltd., and operations edDec 2021)have continued on an as-needed basis 47,000,000 tonnes at 1.40% nickel, 1.90%by Ferromin Inc. Magnetite is mined copper, 0.03% cobalt, 1.30 g/t palladium,and crushed as high-density aggregate 0.80 g/t platinum (InferredDec 2021) for use in heavy concrete applications, Employment2,500 employees and contractors including radiation shielding.NotesGlencores Sudbury Integrated Nickel Operations consist of the Nickel Rim South and Fraser underground mines, the Strathcona mill and the Falconbridge smelter. Glencores matte production from the Falconbridge smelter is shipped to the companys Nikkelverk refinery in Norway for refining. The Nickel Rim South mine is currently Sudburys largest mining operation, producing approxi-mately 14,000 tonnes of nickel a year. Glencore continued to advance the Onap-ing Depth project in 2021. The deposit extends to a depth of 2,600 metres and will be Glencores deepest mine. First ore production is expected in 2023 and full production is expected in 2025. The mine life at Glencores Sudbury Integrat-ed Nickel Operations currently extends through 2034.20ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2022'