b'GOLD MINES EAGLE RIVER MINE Resources1,277,000 tonnes at 1.61 g/t containing Wesdome Gold Mines Ltd. 6,590,000 ounces of gold (Measured andgoldunderground IndicatedDec 2021 for Porcupine Mines Operations combined)Mailing Address93 Mission Road, PO Box 1520 78,100,000 tonnes at 1.31 g/t containing Wawa, ONP0S 1K0 3,290,000 ounces of gold (InferredDec Tel: (705) 856-2721 2021 for Porcupine Mines Operations Fax: (705) 856-7173 combined)Websitewww.wesdome.com Opened2014Mine ManagerJean-Guy Leclair, General Manager, EagleEmployment200 (approximate)Division NotesThe Porcupine Mines Operations include Production Rate538 tonnes per day (mine), 850 tonnesthe Hoyle Pond, Hollinger and Borden per day (mill capacity) Lake mines as well as the Dome mill. Production201867,315 ounces of gold Hollinger is expected to begin ramping 201988,617 ounces of gold down operations in 2023.202087,560 ounces of gold 202199,120 ounces of gold2022100,000 (management projection) HOLLOWAYHOLT MINE (HOLT COMPLEX)Resources1,531,000 tonnes at 13.80 g/t containingAgnico Eagle Mines Limited 677,000 ounces of gold (Measured and gold producer underground (closed)IndicatedDec 2021) Mailing AddressHighway 101 East, Box 609596,000 tonnes at 13.30 g/t containingMatheson, ONP0K 1N0255,000 ounces of gold (InferredDecTel: (705) 567-48622021) Fax: (705) 567-4863Opened1995 Websitewww.klgold.comEmployment220 Mine ManagerDuncan King, Vice President, Canadian NotesThe Eagle River Complex consists of theOperationsEagle River mine, the Mishi mine and theProduction RateHolloway Area: 450 tonnes per day (ca-Eagle River mill. The Eagle River under- pacity)ground mine is located 50 kilometresHolt Area: 2,366 tonnes per day (mine), west of Wawa. Mining of the Falcon zone3,000 tonnes per day (mill capacity)at Eagle River began towards the end ofProductionHolloway Area:Q3 2021. Wesdome plans to use the Fal- 2018942 ounces of goldcon zone to increase production at Eagle201920,000 (management projection)River Complex to 125,000 ounces of gold202029,391 ounces of goldper year. (Holt Complex Operations combined)2021not availableHOLLINGER MINE (PORCUPINE MINES) 2022not availableNewmont Corp. Holt Area: gold produceropen pit201867,770 ounces of gold2019113,952 ounces of gold Mailing Address4315 Gold Mine Road, PO Box 70 (Holt Complex Operations combined)South Porcupine, ONP0N 1H0 202029,391 ounces of gold Tel: (705) 235-6589 (Holt Complex Operations combined)Fax: (705) 235-6551 2021not availableWebsitewww.newmont.com 2022not availableMine ManagerMarc Lauzier, Mine General Manager,ResourcesHolt Complex: 11,690,000 tonnes Porcupine Mines grading 4.50 g/t, containing 1,699,000 Production Rate9,600 tonnes per day (Porcupine Minesounces of gold (Measured and IndicatedOperations combined), 9,979 tonnes perDec 2020)day (mill capacity) 9,097,000 tonnes grading 4.50 g/t, Production2018259,000 ounces of gold (Porcupinecontaining 1,310,000 ounces of gold Mines Operations combined) (InferredDec 2020)2019223,000 ounces of gold (since theOpenedHolloway Area: 2009 (closed 2020)completion of the acquisition of the mineHolt Area: 2010 (closed 2020)site as part of the Newmont GoldcorpEmploymentHolloway Area: 116 (estimate)transaction for Porcupine Mines Opera- Holt Area: 168tions combined) NotesThe Holt mill processes ore from 2020319,000 ounces of gold the Holloway-Holt and Taylor mines. 2021360,000 ounces of gold (guidanceHolloway mine was placed on care and for Porcupine Mines Operations com- maintenance in March 2020. Production bined) guidance in 2020 includes 29,391 ounces 2022340,000 ounces of gold (man- of production at Holt Complex, where the agement projection for Porcupine Minesremaining operations were suspended as Operations combined) a precaution against COVID-19, effective 10ONTARIO MINING AND EXPLORATION DIRECTORY AND RESOURCE GUIDE 2022'