b'At 42 storeys tall, 300 Main is slated to become the largest tower in Winnipeg andthe first ever residential building at Winnipegs famed Portage and Main.AN ACTIVE SITEWe have to be very much aware of how were interacting, To date, crews have encountered the typical challengesnot only with pedestrians and traffic outside the project, that come with erecting a new high-rise structure within abut also with the retailers in the fully-functioning concourse busy urban environment, and the unforeseen challenges ofareas who are still open for business, says Craig, noting, I inheriting an existing structure and functioning property. Inwould say thats been the biggest challenge: maintaining addition to requiring tight coordination and navigating thethose working relationships, keeping those tenants happy logistics of working with restricted laydown areas, Marwestand ensuring those businesses remain viable. has also worked hard to ensure the construction has littleProject designers and constructors have also been impact on its neighbours. challenged to manage the interface between Artis REITsIssue 4WinterEdition 2019/2020 BUILD MANITOBA 37'