53
Issue 3 | Fall Edition | 2026      BUILD MANITOBA
ST. MARY’S FLOODWAY BRIDGE
St. Mary’s Floodway Bridge
ST. MARY’S FLOODWAY BRIDGE 
Hwy 200 at Floodway 
Winnipeg, MB
Owner: Manitoba Transportation  
and Infrastructure (MTI)
Engineer: Tetra Tech
General Contractor:  
M.D. Steele Construction Ltd.
PROJECT DETAILS: 
Structure reconstruction on 
Hwy 200 at the floodway (site 
326), 4.4 km south of PTH 100.

View this content as a flipbook by clicking here.