b'PROJECT PROFILEBoth teams coordinated each load to maximize the materials on each truck and efficiency for offloading, says Freedman. Overall, this created a safer and more productive workplace for all involved. Once materials were delivered, Kerect Scaffold accomplished the job with eight crew members in three weeks time, working 15 shifts.With January temperatures reaching -30 degrees, weather presented a familiar challenge for Toronto inhabitants. Koach explains that the lighter weights of Layher scaffolding made a significant difference for crew members working eight-hour shifts in harsh weather and helped them come in under budget.A little bit less weight makes a big difference, says Koach, who exclusively uses Layher scaffolding. Layher high-tensile steel products come in over 4,000 parts with corrosion-protected galvanized steel to make up the Layher Allround system. Users report a 10 per cent faster build with Layher lightweight products, reducing field hours and exposure to risk. Contractors find it particularly appealing for its ability to withstand extreme weather.Pleased with their work on the first tank, ZooShare hired Kerect to continue workIn-progress construction for the interior of the first tank. Kerect Scaffold Ltd. utilized on the second in July. For the second tank,Layher Allround as shoring to support concrete pour for the inner tank wall.an open STEP measuring 32 metres across, Koachs design called for a three- by three-metre scaffold along the perimeter utilizingthe strong partnership we have built with[] they dont like to think long-term, says Layher Allround. Kerect over of the years, we really wanted toKoach. With Layher, you get more for your Altogether, Koachs tank designs calledexceedexpectations. dollar and it looks clean.for over 45 tonnes of Layher materialsAs owner of Kerect Scaffold, KoachAs of October 2020, ZooShare has not delivered in a quick turnaround to ensureattributes his affinity for Layher scaffoldingsought bids on a third tank, but when they project success. Freedman reflects, Weto an investment in future planning. Otherdo, Kerect Scaffold Ltd. and Layher will be had some tight deadlines to meet, and withcompanies have a mishmash of materialready to team up again and get to work.146 Millwick Drive, Toronto, ONM9L 1Y6146 Millwick Drive,146 MT: (416) 248-6600 Toronto, ONM9L 1Y6 Toronto, ONToll Free: 1 (855) 248-6600T: (416) 248-6600Email: info@ACEcorp.caT: (416) 248-6600 Sales / Rentals / Installation / Training www.ACEcorp.caToll Free: 1 (855) 248-6600 Toll Free: 1 (855) 248-6600Email: info@ACEcorp.caEmail: info@ACEcorp.ca 146 Millwick Drive, Toronto, ONM9L 1Y6Sales / Rentals / Installation / Training Sales / Rentals / Installation / Training www.ACEcorp.caT: (416) 248-6600 Toll Free:w.ACEcorp.caww1 (855) 248-6600Email: info@ACEcorp.ca www.ACEcorp.ca18THE OFFICIAL PUBLICATION OF THE SCAFFOLD INDUSTRY ASSOCIATION OF CANADA'