b'BUILDING CODEeach of the registered professionals in the collection of Schedules B. If a regis-Information shown on drawings shall tered professional of record has crossed out any item on their Schedule B, the coordinatingregisteredprofessional be legible, and shall contain must confirm this item is not applicable to the project or resolve the issue with the registered professional of record.sufficient details to demonstrateBack to Section 2.2. of Division C, we read the following in Article 2.2.2.1. conformance with this Code. General Information Required (bold text is in keeping with the original wording in the code):1) Sufficient information shallbe provided to show that the proposed work will conform to this Code and whether or not it may affect adjacent property.2) Plans shall be drawn to scale andshall indicatea) he nature and extent of the www.precisionmetals.ca twork or proposed occupancy in sufficient detail to establish Your Metal Specialists that, when completed, the work and the proposedT ested and certified byoccupancy will conform to this Code,Proudly made in Canada 8081, 132nd St. Surrey B.C.b) the applicable edition of 604.594.6001 the Code,Producing premier Standard and Custom products for the construction industry since 1975 c)whether the building isdesigned under Part 3 orPart 9,d)he major occupancy classifi-tcations of the building,e) he building area andtbuilding height,f) he number of streets thetbuilding faces,g) he accessible entrances, work tareas and washrooms,h) the accessible facilities partic- ular to the occupancies, andi)the energy compliancepath to which the building conforms, and, where a building conforms to Subsection 9.36.6. or 10.2.3. of Division B, the Step to which it conforms.3) When proposed work is changedduringconstruction,information on the changes shall comply with the requirements of this section for proposed work.20lROOFINGBC l FALL 2021'